The project was located in Etobicoke. We started the demolition of the existing deck on the last week of April 2021 and finished it by May 04, 2021. The ledger was attached to the structure using lag screws; new 6×6” posts were installed. Floor joists were supported with Simpson hangers. The railings and spindles were matched with the neighbors.